Tripoli – Dair Ammar – North Lebanon
This large-scale steel hangar was developed for Hayek Company in the Dair Ammar area of Tripoli. The facility was designed to support logistics and storage operations, featuring a robust steel frame that spans wide areas without internal support. Erad Steel handled the full fabrication and delivery, working alongside the client’s team to ensure structural precision and project continuity.
Scope of Work:
- Coordination with the client team for the installation phase
- Full steel structure fabrication for wide-span hangar
- Delivery of all steel components to the site
- Engineering support and consultation